My my My my
 
 
 
 
 
 

How to paint basketball court lines on driveway


How to Paint a Basketball Court

Most hoop lovers are content with a full court to play in, but most will agree that it’s a different feeling when you play in a good-looking court. Not only will it prolong your sneakers’ life span, paint and design on a basketball can inspire spirit and pride. What’s more, it also boosts teams’ morale, and for designs inherent to a community, it does give your place an identity. This article will provide you with tips and tricks on how to paint a basketball court and more.

What Materials are Used to Paint a Basketball Court?

Both indoor and outdoor basketball courts are subject to a lot of wear and tear. So at some point, you will have to replace or redesign how the floor looks. For wooden floors or wood tiles used in outdoor gyms, you won’t need to replace them as often. The same cannot be said, though, about outdoor courts.

Outdoor basketball courts are subjected to heat, rain, snow, and everything in between. In extreme conditions, paint should be reapplied every couple of months or so. Most experts recommend acrylic paint to finish an outdoor basketball court. What are some of the reasons acrylic is the best type of paint to use for basketball courts?

Perhaps the most important reason is that acrylic is made with specially-graded silica sand that prevents slippage. A slippery basketball court because of poor choices in the type of paint can be perilous and may cause injuries. Applying acrylic paint court surfaces make them aesthetically very pleasing while being easy to construct and maintain. Additionally, acrylic paint is resistant to common chemicals.

For other materials to paint a basketball court, you will need rollers (4 inches and 9 inches), pads, and trays. You may also need assorted art brushes, paint can opener, latex gloves, paint cups, duct tape, painter’s tape, and caution tape. During the project, you may need a water hose, pencil or chalk, and measuring tape.

What Kind of Paint Do You Use on a Basketball Court?

As pointed out earlier, the most recommended type of paint for outdoor basketball courts is acrylic. Acrylic has some properties that make it best for traction while adding to the basketball floor’s aesthetic value. What’s more, acrylic is essentially fade-resistant, easy to repair, waterproof, and highly durable.

Now, there are other kinds of paint that you may use on a basketball court. Some may suggest rubberized paint for concrete basketball courts or perhaps epoxy paint. Generally, both rubberized and epoxy paint are considerably more expensive than acrylic paint, so the latter is more popular as paint used in a basketball court.

How Do You Paint a Three-point Line on a Basketball Court?

Marking and painting the three-point line is one of the more difficult paint jobs you can do on the basketball court. The three-point line is long and shaped like an arc, so it’s easy to mess up if you don’t know how to go about with it.

The first thing that you need to do is look up the dimensions of the three-point line. It would be up to you to adopt the regulation distance of the three-point line, whether the high-school, college, or pro dimensions.  

After determining the dimensions, the next thing you need to do is to create a makeshift compass. One method of doing it, and perhaps the easiest, is grabbing a string. One end should be at the bottom of the basket and have someone hold the other end with chalk. Drag the chalk with the string across to mark the three-point line. You can paint the line with acrylic paint by merely following the chalk lines.

In the NBA, the three-point line does not have the same distance all around. If you want to simulate an NBA three-point line’s appearance, it will be a little bit more complicated than just tracing an arc from one corner to the other.

What is the Best Surface for Outdoor Basketball Court?

If we are talking about outdoor basketball courts, two surfaces are preferred– concrete and asphalt. Other options for the base material for an outdoor basketball court are crushed stone and modular bases. With that being said, most outdoor basketball courts are either concrete and asphalt.

Honestly, it would boil down to personal preference in choosing between the two. In most cases, concrete is the better choice if you consider the cost of maintenance and repair. When done right, a concrete base material for a basketball court is basically maintenance-free. On the other hand, asphalt will deteriorate over time considering the freeze/that cycles, but unlike concrete, it is less likely to sustain cracks.

Now, how do you decide whether to go for concrete or asphalt? It depends on several factors. Relatively, both concrete and asphalt are incredibly strong surfaces, with the former potentially lasting 40 years with proper care and the latter for around 15-20 years. Other factors that contribute to the durability are proper application, thickness, and supporting materials.

As for appearance and functionality, asphalt provides an even surface than concrete. It would also be easier for the joints since it is not as hard as concrete. On the other hand, concrete is essentially non-slip. As we have pointed out, deciding which one is better comes down to personal preference.

As it stands, whether you choose to have a concrete or asphalt base material or surface, both will require upkeep to lengthen its service years. Resurfacing the material at least once a year may help prevent holes and cracks from developing, thereby lessening the risk for injuries. Sealcoating will also help the weather or rough play from ruining the surface, and applying sealant provide moisture resistance, reducing the need for repairs in the long run.

Here is a rundown of the differences between a concrete and an asphalt surface basketball court:

  • Asphalt is the cheaper option than concrete.
  • Concrete is more challenging to install than asphalt. 
  • Asphalt does not last as long as concrete, more so if it’s not correctly built and installed.
  • An asphalt surface is more even and softer than concrete, which makes it easier for the joints.
  • Post-tension concrete basketball courts are a type of concrete that adjusts to tension to prevent cracks. While that is way more expensive, it may be one of the smartest choices as an outdoor basketball court surface.

Additionally, there is a considerable difference in using premium acrylic paint and its standard counterparts. The standard acrylic paint typically has a 1-year warranty while the premium has up to five years. However, the most significant difference is that the premium acrylic paint has a life expectancy of up to 30 years compared to the standard’s five years.

What’s the Average Cost to Paint a Basketball Court?

Like any construction project, the cost of painting a basketball court depends on several factors. Naturally, the bigger the court is, the more expensive the project. How much does it cost to paint a basketball court? A generous estimate, which means at the low end of the spectrum, may cost around $16,000, including the installation of the hoop.

However, not many of us can afford to hire a contractor to do the work. That is why when you consider how much it costs to paint a basketball court, it would be better off to do it yourself than hire someone to do it for you.  

If you or the community already have a basketball court in place, you will save a lot of money doing the project yourselves. At most, you will only need to buy $100 worth of top-notch acrylic paint, or even as low as $50 for acrylic paints with lesser quality. There will be other expenses thrown here or there (like tapes and markers), but that still dwarfs the cost of hiring a contractor to do the job.

5 Tips on How to Paint a Basketball Court

1. To ensure that the entire project goes smoothly, pay attention to smaller details such as the materials and how you want the court to look. Sort the materials, piling them by how similar the items are. If you can, make a diagram to follow the pattern that you’d like as to the appearance of the basketball court.

2. Before applying the primer, make sure you wash the whole basketball court clean with a power washer and a broom. If you don’t have access to a power washer, a hose with a powered nozzle will do. Broom the court afterward to make sure it is clean and let the surface dry completely. Drying time may vary depending on the temperature and humidity. This is not the time to be impatient.

3. After the area dries completely, apply a clear primer to the surface. Use rollers to do this.

4. If you want to take it to the next level and paint some center court logo design, we recommend making a stencil out of poster board. Trace the outline over the poster board and cut out certain sections. Another method uses the grid system where you use the grid or squares as a guide for sketching the image. This is not for everyone, but if you have an artist in your midst, it’s worth a try.

5. Paint the lane in a different color than the lines to add that authentic look and feel. And remember, basketball lines are approximately two inches wide, so don’t vary the sideline, baseline, and centerline width.

Wrapping Things Up: How to Paint a Basketball Court

Basketball courts, whether indoor or outdoor, need retouching and a repaint every once in a while. For outdoor basketball courts, repainting may come more often than the elections since these courts are subject to harsh weather.

The most recommended type of paint for outdoor basketball courts is acrylic. Acrylic paint is made with specially-graded silica that essentially makes it slippage-free. It is also excellent to look at and is available in dozens of colors. Moreover, acrylic paint is resistant to common chemicals.

Acrylic paint is available in standard and premium variants. Standard acrylic paints cost less, but the premium alternative may be the smarter choice in the long run. It has a more extended warranty (five years compared to one) and typically outlasts its standard counterpart in terms of life expectancy (30 yrs to five yrs).

Now, when you’re given a choice between asphalt and concrete as base material or surface in an outdoor basketball court, which should you choose? Most experts would recommend concrete and rightly so. 

Concrete is generally more durable and virtually a non-slip surface. Asphalt has a more bouncy feel and typically costs less to install. However, concrete trumps asphalt when it comes to years of service because some well-built concrete surfaces may last as long as 30 years. Post-tension concrete is an even better, albeit expensive choice. This type of concrete surface “adjusts” to any tension to prevent cracks. It is definitely a smart choice, considering the amount of money you would save in the long haul.

Well, if you had no idea how to paint a basketball court, we hope that this article pointed you in the right direction. Sometimes, these kinds of projects are not to be taken too seriously. If done with friends and the people in your community that care and love basketball, it is definitely an excellent way to build camaraderie while having fun doing manual work.

If you found this post helpful, you’re definitely going to like our other basketball FAQ articles here.

More interesting basketball FAQ posts here:

> How Many Laps Around a Basketball Court is a Mile?

> How Many Yards is a Basketball Court?

> How to Install a Ground Basketball Hoop?

> How Many Square Feet is a Basketball Court?

Best Paint For Basketball Court Lines [Outdoor And Indoor] – FitSeer.

com

Playing basketball on your neighborhood court is a great way to spend time. Painting the basketball court lines will keep your game accurate and fair. The research is done with all you need to paint the lines for your basketball court.

The best paint for basketball court lines will be durable, weather-resistant, and clearly visible in varying light. On outdoor courts, you should use tough acrylic paint for concrete or asphalt surfaces. Choose a fast-drying water-based or solvent-based acrylic paint for an indoor court with a wood surface. All the paints should be anti-skid.

 When you use the right paint on your basketball court, you will have a great place to play. The best paint will give you a safe surface that is easily seen in the heat of the game. Keep reading to learn more about the paints, court lines, and more about painting your basketball court.

When you buy through links on Fitseer.com, we may earn an affiliate commission.

What is the Best Type of Paint for an Outdoor Basketball Court?

The best type of paint you should use on an outdoor concrete or asphalt surface is tough acrylic paint. A tough acrylic paint will be long-lasting with bright color. It can be easy to use, durable, and weather-resistant. 

What Basketball Court Paint Gives the Best Traction?

A tough acrylic paint for the court lines and any painted circles or in the key will give the players firm traction. The acrylic paint will be a solid surface for quick step direction changes and for pulling up to shoot.

What Basketball Court Paint Gives the Best Bounce to the Ball?

A basketball should bounce to waist height. Paint your court with acrylic paint, which allows for great ball bouncing. The paint does not affect the direction of the bounce [no bounce slipping!]. 

What is Acrylic Paint?

Acrylic paint has a hexagon-shaped polymer [a form of plastic] suspending tiny colored pigments in water or a solvent [liquid chemical]. You roll the paint down, and the water or solvent dries. The polymer makes this a durable paint which is great for basketball courts.

What Are Some Great Acrylic Paints for Basketball Courts?

Two great acrylic paints to consider for your basketball court are:

Click here to Fixall Skid-Grip Anti-Slip Acrylic Paint on Amazon.

Click here to see Insl-X Sure Step Acrylic Anti-Slip Coating on Amazon.

What is the Best Type of Paint for a Driveway Basketball Court?

The best paint for your driveway is acrylic anti-slip paint for either concrete or asphalt. Buy the specific paint for the type of driveway you have. Choose quality outdoor paint so that it is weather-resistant and durable.

What is the Best Type of Paint for an Indoor Basketball Court?

You should choose acrylic paint for your indoor basketball court lines. The acrylic paint will give you the traction, durability, and bounce you need. The Fixall Skid-Grip Ant-Slip Acrylic paint will be a great choice inside and outside.

Water-Based or Solvent-Based Paint?

A key consideration when buying acrylic paint is whether or not it is water-based or solvent-based? Your basketball court wood finish will answer this question. Find a paint that complements the wood sealing finish on the court surface. Some solvent-based acrylic paint can harm the finish of the wood. Some water-based acrylic paint may interact with the finish to make the surface slicker.

What are the Lines on a Basketball Court?

The standard basketball court has the following main lines [all lines are 2 inches wide]:

  • Baseline or End Line - the lines that form the ends of the rectangle of the court itself. 
  • Side Lines - the lines that form the long sections of the court rectangle.
  • Free Throw Line or Foul Line - a line 15 feet from the backboard.
  • Lane Line - The two lines connecting the Baseline to the Free Throw Line.
  • The Key - the rectangle formed from the Free Throw Line to the Baseline. Junior High, High School, NCAA Men's, NCAA Women's, FIBA [Federation Internationale de Basketball Amateur] use a 12 ft. wide Key. The NBA uses a 16 ft. wide Key.
  • The Paint - Some basketball courts will color the area inside the Key a different color than the rest of the court floor. This is not required.
  • Hash Marks - Small lines on the side of the Key showing where the players can be for free throws.
  • Half-Court Line, Mid-Line, or Center Line  - the line down the center of the court dividing it in half.
  • Center Circle - the circle in the center of the court around the Half-Court Line. It has a 12 ft. diameter.
  • Free Throw Circles - the two circles that have the Free Throw Line as their diameter. They may only be painted on the top half.
  • Restricted Zone - a dotted half-circle below the basket found in NCAA and NBA courts for designating where a charging foul cannot be called.
  • Three-Point Line [Circle/Arc] - The arc from the Baseline to the top of the Free Throw Circle that forms a perimeter between a 2-point and 3-point shot. 

What Size is the Three-Point Line?

The Three-Point Line on a basketball court measures 19.75 ft for Junior High and High School. The line is at 22 ft. 1.75 in. for NCAA Men's and Women's and FIBA basketball. The NBA uses a Three-Point Line at 22 ft. 9 in.

What Color are the Lines on a Basketball Court?

The lines of a basketball court can be any color. The Three-Point Line, Free Throw Line, the Lane Lines, and the Center Circle must all be the same color. Black and white are common colors for these lines. White is more common outdoors for low-light play.

How do you Paint the Lines on a Basketball Court?

The tools you will need for painting a basketball include cleaning supplies, at least 50 ft. measuring tape, a Tape Machine, a level, paint, a string line, a stencil guide, and appropriate painter's tape. Follow these steps for painting your basketball court:

  1. Decide on the size court you want for the age of the people who will play on it.
  2. Decide on the need for primer and the type of surface paint.
  3. Fix any cracks or chips in the surface.
  4. Clean the surface.
  5. Give 24-48 hours for concrete or asphalt surfaces to dry.
  6. Measure out the basketball court lines and mark them using a Tape Machine that puts the painter's tape down parallel lines. Or you can use a stencil guide.
  7. Use the level to ensure the lines are straight.
  8. Decide on how you will roll the paint. 
  9. For the Three-Point Line, measure from the front of the rim to the surface, make a mark and have a second person hold the end of the string from this point as you draw the arc using chalk or a pencil. Tape the arc.
  10. Paint your lines.
  11. Give the paint time to dry according to its instructions.
  12. Play Ball

Click here to see this stencil kit at Amazon.com.

Fill Any Cracks Before Painting Your Basketball Court

Check the surface where the basketball court will be painted inside or outside. Make sure you fill any cracks or chips on the surface. If you lay a new layer of asphalt on the surface, it takes 2-4 weeks for the asphalt to harden before painting.

What is Underneath a Basketball Court?

For indoor basketball courts, you will find a subfloor beneath the wood of the court. This subfloor can be made of plywood. For NCAA and NBA courts, the subfloor is often a specially designed cushioning system to give the floor more give. Most of the NBA uses maple wood for the court itself.

How Do Basketball Courts Change Paint?

Schools can change the graphics painted on their basketball courts for different tournaments. The graphics are created on the computer. They print the graphic with stencils. Each stencil is layered on the floor and painted from the bottom up. When one layer is dry, the next stencil is smoothed into place.

How Much Does it Cost to Paint Lines on a Basketball Court?

The biggest factor in painting the lines on a basketball court is whether you want the quality of professional painters or what to do the work yourself. Painting the court yourself will cost $200-$300, depending on the paint choice and your time. Professional painters will want between $900 and $3,000 to paint the lines for a basic basketball court.

Professional painters can ask for up to $20,000 for all the work in building a basketball court from scratch in your backyard or a large room in your home or office. The money will pay for the subfloor, flooring, finishing, and painting.

In Conclusion

Paint your basketball court with quality acrylic paint so that it is durable, sharp-looking, and gives good basketball bounce. These paints can be specially designed for great grip, which will help people enjoy your court with fewer injuries. 

Want to know more about basketball? Check out these articles:

How Big is a Basketball Court?

What are Basketballs Made of?

Basketball court markings: standards and norms

Author of the article

Khvatkov Dmitry

Consultant in the production of rubber coatings

Basketball field marking requirements are approved by the FIBA ​​standard. The site must be flat with a hard surface, free of bends, cracks and other obstacles. The accepted dimensions of the field are 28 m long and 16 m wide. By NBA standards, the field is slightly larger: 28.7 m (94' ft) long and 15.3 m (50' ft) wide.

Areas not intended for international competitions may differ from accepted standards (for public use, in schools or universities, etc. ) and usually vary from 20 to 28 m in length and from 12 to 16 m in width.

Basketball Court Marking Standards

Basketball court markings are conventionally divided into 5 components:

  • Boundary lines. They are located along the perimeter of the site and set its size. The lines that run along the field are called side lines, and those that are behind the baskets are called front lines.
  • Central line. Divides the court in half parallel to the front lines.
  • Central zone. It is a circle and is placed in the middle of the center line, and, accordingly, in the center of the entire field.
  • Three-point line. It is a semi-ellipse and is located around the shields on both sides of the field. It limits the close range.
  • Free throw line. It is located in front of the boards parallel to the front line and is limited on the sides by paint lines.

The standard line width is 5 cm. All outlines and lines must be of the same color (usually white) and be clearly visible from anywhere on the court.

Common lines

Common lines are used to limit the playing area of ​​the court. The side lines (along the field) according to FIBA ​​standards should be 28 m long, and the front lines - 16 m. For public areas, deviations from the accepted standards are allowed. Typically, basketball courts in schools or gyms are made from 20 m long and 12 m wide.

Central lines

The center line is parallel to the front and divides the field exactly in half. According to the standards - it should extend beyond the side lines by 15 cm on both sides.

In the middle of the center line there is a circle with a diameter of 3.6 m, which limits the central zone of the field. In this zone, the ball is played at the beginning of the game.

Three-Point Line

Three-Point Lines are located around the backboards on both sides of the field and consist of two straight lines 2.9 long9 m and a semicircle. Straight lines run perpendicular to the front at a distance of 0. 9 m from the side lines. Despite the fact that visually the distance from the ring to the side of the three-point line seems to be less than to its central part, the distance from the backboard to any point is 6.75 m.

Penalty lines

Penalty lines limit the nearest area at the backboard. They consist of a trapezoid and a free throw zone.

Despite the name, the "trapezium" is a rectangle (until 2009year it really was a trapezoid), which is located under the shield. Its dimensions are 5.8 meters long and 4.9 meters wide. The shield is located at a distance of 1.575 m from the end line in the middle of the court. In front of the backboard, at a distance of 1.25 m, there is a semicircle that limits the area for picking up the ball.

At a distance of 4.225 meters from the backboard, the trapeze zone ends and the free throw zone begins. It is a semicircle with a diameter of 3.6 m (like the central circle).

Paint zone lines

These lines are serifs on both sides of the trapezoid (parallel to the side lines). They limit the areas for players who are fighting for the ball during a free throw.

Zones on the basketball field

The basketball court is divided into zones using markings. Each zone has its own specific rules.

Center circle

The center circle is used as a separate kick-off area at the start of the game. One representative from each team stand in a circle from their side and fight for the ball in a jump, after it is dropped by the referee. All players are exclusively on their side of the field, except for one who rebounds on the opponent's side.

Neutral zone

The peculiarity of this zone is that as soon as the player of the attacking team with the ball crosses the center line and is on the side of the opponent, he cannot pass the ball to the player of his team who is on the other side of the field (i.e. behind center line on your side).

Three-point zone

The three-point line limits the near zone of the shot. Hitting the basket from outside the basket brings the team three points. If the throw was made inside the zone, then it brings two points.

Three-second zone

This is the zone in close proximity to the ring. It is called three-second, since the player of the attacking team cannot be in it for more than three seconds. Most balls are thrown in this zone, so when attacking, it provides maximum protection.

Free throw area

In controversial situations, a free throw is provided from this area. The player of the attacking team must score the ball without stepping over the line of the trapezoid. At the same time, the players of both teams are not in the three-second zone. They take up positions along the paint lines on the sides of the trapezoid and may not step outside the lines until the free throw shooter has shot the ball.

How to mark a basketball field?

Basketball field markings, whether it is an international competition court or an open-air amateur field, are best applied using special equipment. This will ensure the long life of the coating, the lines will not clog and will promote fair play.

You can order the marking of a basketball court in Moscow and the Moscow region from Rezkom. We will measure the premises and develop a design project for the field so that it complies with generally accepted rules and is convenient for operation. For more details, you can contact our manager by phone 8-495-64-24-111.

Construction of a turnkey basketball court|SportObject

The company "SportObject" offers its services in the construction of turnkey basketball courts. Trusting the construction of our company, you get a whole range of turnkey services, including design, ground work, laying the base and coating, marking and other construction work. We strictly adhere to the agreed deadlines and provide our clients with a work schedule that indicates the start and completion dates for construction.

Find out why it is safe to cooperate with us

Details

Calculation of the cost of the object

To find out the estimated cost of your object, select the options below or use the detailed calculator available by clicking the "Make a detailed calculation" button.

1. Coating:

Choose the type of coating for your object.

Not selectedAcrylicRubber crumbModular plasticPolyurethane

2. Destination:

Specify where your object will be used.

Not selectedFor suburban developmentsFor educational institutionsFor competitionsFor sports organizationsFor private business

3. Your object:

Specify whether your object is located: indoors, outdoors or it needs a hangar.

Not selectedOutdoor (outdoor)Indoor (indoor)To be built (prefabricated hangar)

4. Field sizes:

Select the appropriate field size from the provided list.

Not selectedCustomStandard30x18 - (playing dimensions 28x15) 34x19 - for competitions (playing dimensions 28x15)

Specify the parameters of your object in a detailed calculator and get an approximate cost of the service.

Budget savings

We help reduce your costs by up to 40% and avoid unnecessary overpayments.

Project in 3 days

We will design and calculate the exact cost of your object in just 3 days.

5 year warranty

We give great guarantees for imported goods and materials from our warehouse.

421 590* 421590 RUB

* The price is indicated for the basic package with a coating without a base. You can also use the detailed calculator.

Implementation example

Private sector basketball court

Difficulty:

Rubber slabs for outdoor sports grounds are perhaps the most reliable and rational option of all. The coating is made of high-strength crumb rubber and a binding polymer (polyurethane adhesive).

More details

Get a consultation

Request a call back and one of our managers will advise you on all your questions

You can also call
8 (495) 240-82-24

By submitting your personal data through the forms on the site, you give your consent to the processing of personal data in accordance with Federal Law No. 152-FZ "On Personal Data" dated July 27, 2006, as amended on July 1, 2017.

Stages of construction on the example of a football stadium

The thickness of the foundation pit and the amount of materials that are needed for your foundation, we select depending on the size of the field. We select drainage and other systems based on the regional location (how much precipitation is in your region, what kind of drainage is needed). Additionally, we equip drainage wells, or divert them to the drainage system. Field slopes of several different types depending on site operating conditions.

Preparation of excavation, sand bed, drainage system

The quality of a football field is more than half dependent on the quality of the base! Our base is a monolithic solid single layer, which over the years does not form any fractures, the soil does not go anywhere and remains flat throughout the entire period of operation. Relatively speaking, even if a tractor passes over the base, there will be no tire marks, because everything is solid and dense!

Sequential compaction of base layers

We carry out all types of additional improvement works: we can install a fence for you, pave an asphalt path to something, level the territory, paint walls, borders, etc. We will perform all the required related work!

Installation of the curbstone

The laying of the artificial grass itself is as important as the preparation of the base. When laying the field, an important aspect is gluing the rolls and cutting the markings. Gluing must be done securely. The material in the work requires getting used to, because the two-component glue rolls down after a while and they need to work quickly.

Laying the grass on the prepared base, gluing it and cutting the markings

Be sure to remember: the gate is installed with a safety requirement so that it does not turn over. Therefore, this aspect is given special importance. In this regard, the gate is either concreted or attached to an accompanying fence.

Installation of the goal

The backfill of a football field determines a large part of the performance of the game. Backfilling is a responsible job, because the presence or absence of drops and bumps, which will eventually be felt during the game, depends on the uniform distribution of sand and crumb rubber on sports grounds. That is, there should be both a flat base and a high-quality pile with an even distribution of backfill under it.

Raising grass, distributing sand and crumb rubber across the field

We cooperate with the largest manufacturers of stands, fences and other sports equipment in the Russian Federation. Therefore, if necessary, we can supply everything you need to the object at a wholesale price. We install all this equipment, advise in which cases which is better, etc. We can supply many things both in a finished version and make them ourselves on the spot.

Installation of additional equipment (treadmills, jumping pits, safety fences, grandstands)

You can also be sure that we will carry out all the necessary arrangements for their improvement on the site and the adjacent territory.

Landscaping

The thickness of the foundation pit and the amount of materials that are needed for your foundation, we select depending on the size of the field. We select drainage and other systems based on the regional location (how much precipitation is in your region, what kind of drainage is needed). Additionally, we equip drainage wells, or divert them to the drainage system. Field slopes of several different types depending on site operating conditions.

Preparation of excavation, sand bed, drainage system

The quality of a football field is more than half dependent on the quality of the base! Our base is a monolithic solid single layer, which over the years does not form any fractures, the soil does not go anywhere and remains flat throughout the entire period of operation. Relatively speaking, even if a tractor passes over the base, there will be no tire marks, because everything is solid and dense!

Sequential compaction of base layers

We carry out all types of additional improvement works: we can install a fence for you, pave an asphalt path to something, level the territory, paint walls, borders, etc. We will perform all the required related work!

Installation of the curbstone

The laying of the artificial grass itself is as important as the preparation of the base. When laying the field, an important aspect is gluing the rolls and cutting the markings. Gluing must be done securely. The material in the work requires getting used to, because the two-component glue rolls down after a while and they need to work quickly.

Laying the grass on the prepared base, gluing it and cutting the markings

Be sure to remember: the gate is installed with a safety requirement so that it does not turn over. Therefore, this aspect is given special importance. In this regard, the gate is either concreted or attached to an accompanying fence.

Installation of the goal

The backfill of a football field determines a large part of the performance of the game. Backfilling is a responsible job, because the presence or absence of drops and bumps, which will eventually be felt during the game, depends on the uniform distribution of sand and crumb rubber on sports grounds. That is, there should be both a flat base and a high-quality pile with an even distribution of backfill under it.

Raising grass, distributing sand and crumb rubber across the field

We cooperate with the largest manufacturers of stands, fences and other sports equipment in the Russian Federation. Therefore, if necessary, we can supply everything you need to the object at a wholesale price. We install all this equipment, advise in which cases which is better, etc. We can supply many things both in a finished version and make them ourselves on the spot.

Installation of additional equipment (treadmills, jumping pits, safety fences, grandstands)

You can also be sure that we will carry out all the necessary arrangements for their improvement on the site and the adjacent territory.

Landscaping

Options

How do we work?0003

We carry out construction and installation works

We hand over the finished object and provide a guarantee

Private

I am a private client

We work in all regions of the Russian Federation

We cooperate with contractors who are ready to travel to any city in Russia. We take measurements, bring materials or buy them in your city, install coatings and equipment.

We offer standard solutions

We are engaged in the construction of both standard and unique projects. We work individually with each client: we take into account your wishes, fit into the budget and comply with the agreed deadlines.

We take care of your budget

We help clients in the selection of materials, places for construction, provide detailed advice and suggest how to get a fully functional sports facility at a lower cost.

We create 3D visualization

We offer the development of a 3D model that will convey a complete vision of the concept of the future object. Also, this service will help both us and the client to eliminate the possibility of error at the design stage.

We make reconstruction and repair

We carry out all types of reconstruction works: we repair the foundation, lay the foundation, replace the coatings, install fences, roof structures, make glazing and ennoble the areas.

I am a frequent customer

Corporate

I am a corporate client

We offer additional services

We are engaged in maintenance of the facility after commissioning: we take care of the condition of sports surfaces, ennoble areas, do glazing and other general construction work.

We take on complex projects

We have enough experience and capabilities to solve the most non-standard and complex tasks. Many of our specialists took part in the preparation of sports grounds for the Olympic Games in Athens and the 2018 World Cup.

We cooperate with global companies

We maintain strong partnerships with well-known manufacturers from Europe and Asia. At the request of the customer, we supply the goods you like from abroad in the shortest possible time.

We provide detailed advice

We answer in detail all the client's questions about the project and our services. Also, we are ready to provide professional legal advice on construction issues.

We build turnkey facilities

We provide a whole range of services: designing an object, drawing up design estimates, building a foundation and base, selecting and laying coatings, erecting roofed structures, installing appropriate equipment and necessary communications.

Our clients

I am a corporate client

Acknowledgments and certificates of conformity

Company "SportObject" offers its services in the field of sports construction. We are engaged in the construction of turnkey basketball courts: we design, draw up design estimates, coordinate the construction, mount the foundation and roof structures, lay bases and coverings, perform finishing work, provide communications and deliver sports equipment. Each of the stages of work is implemented strictly according to the schedule agreed with the client, which allows us to deliver a fully finished project on time.

We value the trust of each customer and guarantee comfortable cooperation
  • We travel to any place in Russia;
  • We provide detailed advice on construction issues;
  • We select high-quality solutions for the client's budget;
  • We help with the choice of an advantageous place for construction;
  • We work with complex and non-standard ideas;
  • We offer creative solutions within a reasonable budget;
  • We provide additional facility maintenance in other regions of Russia.

We supply basketball surfaces from world manufacturers

The dynamics of basketball matches means high speed, sudden movements and heavy loads on the joints. It is very important that the flooring of the basketball court is both wear-resistant and injury-proof at the same time. For basketball courts we offer: tennis, hard or soft-hard, modular plastic, polyurethane coating and crumb rubber coating.

Our company only works with proven materials that have passed the strictest quality control, so we offer a wide selection of outdoor basketball surfaces from domestic and foreign manufacturers, such as: ERFOLG , BERGO , PLASTFACTO , Conica , Novol , Aropa , CRUMB , GUMBIT 9099 , MASTER FIBER and many more.

In addition to the construction of basketball courts, we take care of the complete set of the object and provide it with all the necessary equipment until it is ready for operation. In accordance with the requirements of the customer, any sports equipment can be installed: backboards, rings, stands of a certain capacity, running tracks, a sector for standing long jumps and, of course, various types of fences.

We offer metal railings or safety nets for the customer's choice
  • Metal 2D and 3D fences are sectional structures of increased strength with rod diameters from 4 to 6 mm, protected by a polymer and zinc coating. Unlike other fences, mesh panel fencing is maintenance-free - it does not get dusty, does not fade in the sun and does not deform under wind loads, and also does not need periodic painting
  • Protective mesh made of kapron or nylon threads can have different mesh sizes: 100x100, 40x40 or 20x20. Such a fence is ideal for zoning the playing space and protecting spectators from sports equipment. The mesh does not need maintenance and is easily restored

As we build new basketball courts, we also work with existing facilities that need a major overhaul or minor restoration. We are happy to undertake the design of a sports facility, without including construction work, and for the implementation of the facility according to an already finished project.


Learn more